Needing advice and/ or motivation here, folks.
I had this vision of buying inexpensive curtains (check), then adding two rows of ruffles in one of Scarlett's fabrics to the top. I'll be doing the same thing to the bottom of her inexpensive bumper...
I had this vision of buying inexpensive curtains (check), then adding two rows of ruffles in one of Scarlett's fabrics to the top. I'll be doing the same thing to the bottom of her inexpensive bumper...
The problem lies in the fact that the one, single ruffle took me all of my free time today. Not cool. Meaning, I would have 16 more of them to do (4 curtains, 4 sides to the bumper). Not cool again. That's over two weeks of nap time working on the blasted ruffles!
Should I either, a) be happy with one ruffle (tell me it looks, fine, please?)
or b) do it right, add another ruffle (which would be directly below the top one), spend weeks of frustration all to add up to a finished and satisfactory product...
This is where you come in.
Make the right decision.
Seriously, I'm so burnt out already, I'm leaving it up to you.
The most comments for A or B wins the race.
Thanks!